Turritella Heavy Lift

17-Oct-2018

By: The Pipeline

Danos successfully completed a variable frequency drive heavy lift. It is now in its final location onboard the Turritella. Danos crews also installed a barrier fluid hydraulic power unit. The lift was safe and smooth, the net result of the detailed planning, preparation and fabulous teamwork by all involved.


The Pipeline

Keeping employees connected.


Comments




Write Your Comment






Captcha Image